Saturday, March 8, 2014


Top photo shows inside of patch in above photo.  Held in place with drywall screws til epoxy cures. Next step will be two layers of 12 oz biax on the outside and hopefully one on the inside, although that might be easier said than done.  Maybe after I flip the hull.

Friday, March 7, 2014

More work on fixing holes and fairing the bow

Did some more on fairing the patches in the bow, got it pretty good and now need to fill the weave and sand.  There are two layers of 12 oz biax tape over the new cutwater.




Saturday, March 1, 2014

Nothing much happening right now, waiting for some 40 grit sandpaper.  While waiting figured out how I am going to patch some of the horrendous holes in the hull.